A division of United Ventures Company Ltd.Al Khobar, Saudi Arabiasales@unitedvco.com
Tile and flooring works / Contracting enquiries

Tile installation & flooring works.

Tile installation and flooring quality depend on setting-out, substrate condition, levels and finishing details. We review defined floor and wall tiling requirements for new spaces, renovations and targeted maintenance scopes.

Illustration of commercial flooring tiles and tile layout
PROJECT FOCUS / UVCO PROJECTSTile and flooring installation
Scope overview

Floors and walls planned from substrate to finish

For a clear commercial flooring or tiling estimate, separate removal, substrate preparation, tile supply, fixing, grout, skirting and thresholds. Site access and required working hours can be as important as floor area.

For procurement & project teams

Details for a tiling or flooring BOQ

Providing these details helps define quantities, responsibilities and site constraints before pricing.

  1. Identify floor and wall areas, tile sizes, thickness and material.
  2. Clarify whether tiles, adhesives, grout and trims are free-issued or supplied.
  3. Document substrate condition, removal work and leveling requirements.
  4. Indicate joint layout, thresholds, skirting, movement joints and completion deadlines.
Have a BOQ or SOW?

Send the brief. Start with clarity.

State the project location, scope, approximate quantities and timing. Email drawings or specifications directly to the contracting enquiry team.

Discuss this scope ↗sales@unitedvco.com
Technical scope note

Suitability of the tile system and any slip, fire or wet-area performance requirements must be assessed against the project design and application.

Common questions

Before requesting a quote.

Can I request labour-only tile fixing?

You can specify labour-only or supply-and-install requirements; both require a clear division of materials and responsibilities.

Do you review tile replacement in operating facilities?

Yes. Send the affected areas, access restrictions, protection needs and proposed working schedule.

Should waterproofing be included with bathroom tiling?

If waterproofing forms part of the requirement, list it separately and provide the system or design specification.

Related contracting services

Other scopes that connect.

Project enquiry

Have drawings, quantities or a BOQ?
Let’s discuss the scope.

Request a Quote ↗